Skip to content

Line 1

Train arrving at Crumble Mountain

Line 1 (Chinese: 1号线) is a line connecting Mountains to Thompson Road. The line is not long but is kept for historic purposes. It is _ km long and is the first line in the server to have a rail based system.

Stations

Station Transfers
Mountains Check article.
Lakeside Forest
Crumble Mountains
Thompson Road (WIP)

History

Opened in late August for the use of testing rail transport, but because of it being very popular, is still kept to this day.

Extra Info

Line 1 uses the following for the train:
M-Train Cav (Forwards, Mini)
Non-refurbished M-Train Cab (Backwards, Small)

Line One Depot